4 thoughts on “Plenty of work to do before we open!”

    1. Hi Sonia
      Thanks for the comment. Yes you can have a drink without food – but we hope to make it so tasty you can’t help but eat!
      Interior design still work in progress – no brass plates or horse brasses though.

    1. FYI we are currently replacing the foul drainage and reducing the height of the patio as it is above internal floor level and per structural survey is vital to the protection of the building. The planning inspector has been out and is happy that these works do not need planning. We are currently arranging a Pre App. meeting with Uttlesford to discuss our plans.
      Feel free to ask any further questions.

Leave a Reply

Your email address will not be published. Required fields are marked *